The acquisition entails that the contractor shall provide all labor, equipment, tools, accessories, and materials (carpet and related items shall be purchased from mandatory Tier I contracts listed in paragraph 2.1 of the SOW as represented in Attach 1) to properly remove existing and install approximately 396 square yards of carpet tile to include 1135 linear feet of 4“ cove base, using the direct glue down method of installation in building 610, on Malmstrom AFB, MT.
↧