The contractor shall provide a washer extractor in accordance with the specifications below, remove and dispose of the old washer (see attached photos), and install the new provided washer extractor. The contractor shall provide all labor, equipment, tools, accessories, and materials to properly remove existing and install new washer/extractor in building 349, on Malmstrom AFB, MT. Additionally, the contractor must provide one–time equipment training to the end user. Please see attached SOW for washer extractor specifications.
↧