22 FEB 2024 – RFQ 1240LU24Q0012 and its attachments are uploaded to SAM. This construction requirement at Devil Creek Campground, Flathead National Forest in Montana consists of, but is not limited to the following: excavation and backfill for buildings; pre–cast concrete utility building installation; MEP wellhead replacement; and, utility equipment and water system connection. The closest city to this location is Columbia Falls, Montana.Responses to this solicitation are due to the Contract Specialist no later than 1700 Eastern Time on 20 March 2024. This will be a 100% Small Business Set–Aside. Prospective offerors will need to submit both a Price and a Technical Proposal. Applicable NAICS Code is 237110 for Water and Sewer Lines and Related Structures. Estimated magnitude of construction cost: between $25K and $100K.
↧